There is a large amount of maintenance in the Low voltage cabinet. The original equipment has not fully considered the grounding wire hanging position during the overhaul and brought big inconvenience to the daily overhaul.
After full assesment on the equipment, we design a complete plan and add Grounding device for Guangzhou Metro Line 3.
Engineer mounting the equipment. | Part of the detail | Succesfully adding the Grounding Device |